| Situated within the port of Cape Town, these facilities are utilized for the construction, repair and maintenance services in the offshore oil and gas industry, and vessels topsides conversion projects, together with transportation Barge/Vessel load-out's.
Process module RO1 (365 tons) was prefabricated and erected, as well as the subsea manifold and lateral connections to Xmas trees, for the EM Field Development offshore South Africa. More recently the FPSO "Glas Dowr" was upgraded for Bluewater for the PetroSA "Sable" field development. The FPSO is 110,000 tonnes, 245 metres long and 52 metres wide and was moored at A-berth for 10 months. |  |
 | Specifications of "A" Berth
| Access: | 20 mins from airport, near major freeways & central railway station |
| Hotels: | wide choice in vicinity |
| Office space: | 500 m² including permanent offices, all equipped with Telephone/Internet |
Power, Water, Parking and 24 hour Security
|
| Quay: | 12.2m water depth (dredged 2002) |
| Quay length: | 275m |
| Harbour access: | 180m wide, channel depth 15m |
| Open Storage: : | 50 000m² tarmac |
| Closed Warehouse: | 6 000m² of which 3000m² is fenced & secure |
Mobile Craneage available for 24 hour hire:
- NPA 200 tonne floating crane
| - 2 No 14 tonne Franna "Pick & Carry" | - 1 No 50 tonne Grove 3050 |
| - 1 No 120 tonne Grove AT 9120 | - 1 No 1000 tonne Liebherr LTM |
The above attributes make it a very suitable Logistic Support Base for offshore activities for the West and Southern coasts of Africa. |
|